Before...
and after....
Is this progress?
I haven't forgotten about my bathroom shower. With my chest injury it doesn't appear I will be mixing and pouring concrete for the shower pan anytime soon. So I looked for a shower / tile contractor. Joyce's son who does remodeling jobs recommended Kevin to me. Kevin is working on a job down the road and stopped by to look over my framed in shower.
I plan to have Kevin do the shower pan for me and possibly all the tiling. First I have to change things.
The wood shower threshold had to go. Too much of a chance of water getting to the wood via the nails used to fasten the pan liner to the threshold. Kevin said he recently worked on a shower that was a year and a half old. He said when he used a crowbar to remove the wood threshold water ran from the wood. He said he builds a concrete threshold in his work.
I had to take the lower concrete boards off. Think of a roof. Each lower shingle goes under the shingle above. The bottom concrete boards need to go over the concrete shower pan instead of behind it.
To take the concrete boards off I had to remove the bench. The bench also was another area of potential problems. Each side of the bench had a gap to the wall's concrete board. A potential area of water leakage. Since I had to remove the bench to remove the concrete boards Kevin recommended I build and attach the new bench to the wall.
I ended up returning the bags of concrete mix to Lowe's. Kevin uses and recommends a different type of concrete mix. He said that mix is not a rough as the mix I got and is easier to slope to the drain.
Kevin has a few jobs ahead of mine and may not get to my bathroom for a month. In the meantime I can do some prep work on it. As you can see I removed stuff. Now to build a new bench.